- 13:30Major tin deposit discovered near Meknès, Morocco
- 12:50Moroccan pharmacists raise concerns over impending health reforms
- 12:20Morocco enhances military capabilities with SpyX drone acquisition
- 11:45Al Amoudi’s legal battle: Morocco stands firm against financial pressure
- 11:15Air Arabia Maroc launches direct flights from Nador to Murcia
- 10:45Al Barid Bank reports 196% profit increase for 2024
- 10:10GITEX Africa 2025: Spotlight on artificial intelligence in Morocco
- 09:45UEFA Rejects FIFA's Proposal for 64-Team World Cup in 2030
- 09:10Air Europa Resumes Flights to Marrakech: A Boost for Tourism
-
Weather
11°C/20°C
-
Sunday
13.2°C/18.4°C
-
Monday
14.2°C/20°C
-
Tuesday
15.1°C/26.9°C
-
Wednesday
17.1°C/21.2°C
-
Thursday
16.2°C/16.2°C
-
Prayer times
RABAT2025-04-05
Follow us on Facebook
Bouhmala and Bouyacoub Group Wins Major Tangier Airport Expansion Contract
The group of architects led by Tarik Bouhmala and Abdelkrim Bouyacoub has been chosen to undertake the expansion of Tangier airport, a project commissioned by the National Airports Office (ONDA). This project encompasses the construction of a new passenger terminal and control tower at Tangier Ibn Batouta Airport.
The ONDA has outlined that the primary objective of the Tangier airport expansion is to furnish the airport hub with the necessary technological facilities and infrastructure to ensure seamless flight operations on-site.
In essence, the tender pertains to the construction of a passenger terminal spanning approximately 55,000 m2. The public competition encompasses a waiting and circulation area, a reception hall, connections to various modules, shops, and services, along with a ticket collection area for departing passengers.
Moreover, an inspection area is envisaged for screening prior to entry into the public concourse, facilitating access control for all terminal users. A check-in area is also integrated, featuring dedicated check-in desks for passengers and their baggage, as well as designated queuing areas.
Comments (0)